Change Page:
< 12 | Showing page 2 of 2, messages 21 to 31 of 31
alecescolme
-
Total Posts
:
64
-
Reward points
:
1717
- Joined: 17/Oct/2010
- Location: Over Kellet, Carnforth
-
Status: offline
|
|
|
|
|
CoggesRailway
-
Total Posts
:
1919
-
Reward points
:
3261
- Joined: 25/Oct/2009
-
Status: offline
|
Wow!!! Right lads I hope you guys are having open days in 2012!!!
|
|
|
|
Gavin Sowry
-
Total Posts
:
165
-
Reward points
:
2409
- Joined: 27/Oct/2009
-
Status: offline
|
Gavin Sowry Taita Gorge Railway Wellington NEW ZEALAND
|
|
|
|
Gizzy
-
Total Posts
:
6295
-
Reward points
:
3456
- Joined: 26/Oct/2009
- Location: The Burgh of St Edmunds in Sunny Suffolk
-
Status: offline
|
|
|
|
|
shropshire lad
-
Total Posts
:
804
-
Reward points
:
3205
- Joined: 25/Jan/2010
- Location: Sunny Shropshire
-
Status: online
|
Colin Lenz DCC with wireless Navigators running a Rule 8 railway
|
|
|
|
stockers
-
Total Posts
:
4861
-
Reward points
:
3363
-
Status: offline
|
Cyclone My worst nightmare. I get so many derailments on the one point I have, Im considering taking it out. Looks very good though and well laid. With the greatest respect to your track and its laying - you seem to have a problem woth your point. I run 9 points so far and have very little problem with them. In fact, I find the great thing with G is that you dont get derailments. The only repeating poblem I have had so far was the Piko Camel not liking an LGB R3 point in the facing direction. On closer inspection the frog had ridden up on the loose ballast and was higher than the outside rails - soon fettled.
|
|
|
|
KentKeith
-
Total Posts
:
482
-
Reward points
:
3115
- Joined: 24/Oct/2009
- Location: SouthEast Kent
-
Status: offline
|
stockers Brill pictures Keith. Have you got the power on yet. we could be over soon! Alan, Power won't be on until Spring at the earliest - the spirals are closed due bridge repairs - the bridge started falling apart last summer and needs rebuilding: At the same time have to remove and replace the breeze blocks on the section leading up to the bridge: This is the only section of track using breeze blocks (kindly donated by one of my neighbours) and they are crumbling away. Replacements will be my regular aerated bricks - the first ones were laid about seven or eight years ago and are still going strong Still plenty of work to do  ........
Keith In the sunny South East closer to France than rest of the UK
|
|
|
|
stockers
-
Total Posts
:
4861
-
Reward points
:
3363
-
Status: offline
|
Working day on the EG&SNNR coming up Keith - just tell us when!
|
|
|
|
Gavin Sowry
-
Total Posts
:
165
-
Reward points
:
2409
- Joined: 27/Oct/2009
-
Status: offline
|
 In track design, I always try to avoid reverse R1 curves. Even a 'standard crossover'  or main to siding..... Annie and Clarabel just won't make it across.  Like the way Gizzy has utilised the 'curved road' of the turnouts, that actually eliminates reverse curves. The only reverse curve I have, is R5.
Gavin Sowry Taita Gorge Railway Wellington NEW ZEALAND
|
|
|
|
stockers
-
Total Posts
:
4861
-
Reward points
:
3363
-
Status: offline
|
Keith, You need a plank!
<message edited by stockers on 22/01/12 09:03 PM>
|
|
|
|
tramcar trev
-
Total Posts
:
980
-
Reward points
:
1861
- Joined: 22/Jan/2011
- Location: Canberra, Australia
-
Status: online
|
I wont have anything quite that spectacular as Im building all my own points..... I will have curved points and some intersting configurations....
|
|
|
|