No doubt eying it up for demolition or possibly repair?Fred was out today to inspect the latest building on the line
View attachment 312255View attachment 312256
- 1
- Show all
No doubt eying it up for demolition or possibly repair?Fred was out today to inspect the latest building on the line
View attachment 312255View attachment 312256
It’s coming on well Sam.the two loops have been connected so trains can run in both directions, as well as the shuttle which will be extended in the future,
View attachment 319167View attachment 319168View attachment 319169View attachment 319170View attachment 319171
Well, toucan play at that game...I see I'm not the only one that has a flamingo by the tracks.